Concept demo for review. Prices, claims and technical statements marked are pending confirmation. Not a live site.
Medical device compliance

Your device's case, on paper before you sign the test quote.

What applies, what doesn't and why, the test levels, and what counts as a pass. Written down first, so the lab runs your plan instead of writing it for you.

The lab still runs every test your case requires. The evaluator still decides. The case stays yours.

See how it works
standards-matrix · sample-device.md
SAMPLE
IEC 60601-1
pending
Mains-powered ME equipment used on patients: general safety and essential performance.
IEC 60601-1-2 (EMC)
pending
Professional healthcare environment. Your pass/fail criteria are written before testing.
IEC 60601-1-6 / IEC 62366-1
pending
Operator interface present: usability engineering file required.
IEC 60601-1-8 (alarms)
pending
No alarm system in this design. Reason recorded; revisit if alarms are added.
IEC 60601-1-11 (home use)
pending
Intended use is professional facilities only, not the home.
IEC 60601-2-xx (particular)
pending
Depends on the final intended-use statement. Question sent to the design team.
Reason written: 0 of 6Written before the test quote
The quote is a scope

A test quote is a scope somebody else wrote.

Most device teams ask the lab what to test. It's a reasonable question. But labs quote what they're asked to quote, and certification bodies aren't allowed to consult on your design. So the scope gets set before anyone has written down what your device actually is.

That's how teams end up with lines they can't explain, tests that come back asking for more, and pass/fail criteria nobody agreed on beforehand.

The lab quote (sample)

IEC 60601-1 full testRequired for your route
IEC 60601-1-2 radiated immunityRequired for your route
IEC 60601-1-8 alarm testingAsk the lab why
Home-use environment (-1-11)Ask the lab why
Usability file reviewRequired for your route
Re-test allowanceAsk the lab why

Your device's case

Device descriptionOn paper
Standards matrixReason on every line
Test levelsSource for each level
Pass/fail criteriaYours, signed before testing
Test planThe lab executes it
RouteReport-only or mark, chosen

Every line gets a tag: required for your route or ask the lab why. Never "remove." Justified scope, not reduced scope.

Who this is for

Two starting points.

Most clients arrive holding a lab quote, or holding an ISO 13485 project they're running alone.

If you're holding a lab quote

The engineer at the test gate

  • An IEC 60601 safety, EMC or usability quote on your desk
  • Lines you can't explain, or two quotes that don't match
  • A design that's still moving, and a date that isn't
See the Test Strategy Package
If you're running ISO 13485 alone

The one-person quality team

  • ISO 13485 and FDA's QMSR, with no one to check your calls
  • Templates that don't say which requirements apply to you
  • A CEO who wants to know why it costs what it costs
See the ISO 13485 path
How it works

Three steps. You can stop after any of them.

Roadmap Session

90 minutes on your device. A few days later you get a one-page standards matrix with a reason on every line. It's yours to keep.

Your device's case

The full case file: every standard and collateral, test levels with their sources, draft pass/fail criteria for your signature, and the test plan.

The lab executes

You hand the lab your plan. Every line on the quote is either required for your route or a question you've already asked in writing.

What you're not risking

Notice what's missing from our terms.

A pass. A clearance. A smaller quote. Nobody can promise the evaluator's verdict before the tests have run, so we don't. We put money behind the work.

What we stand behind

  • A written reason on every line of your matrix
  • Delivery on the date we agree
  • Your Roadmap Session fee back if the read-out isn't worth it, and you keep the read-out
  • The session fee credited in full toward the case

What we never promise

  • FDA clearance, certification or a notified-body outcome
  • Passing first time, or "no findings"
  • A lower test quote. Your quote may go up if your case finds a line nobody listed
  • Skipping any test your device requires
Ways to work together

Start small. Every step proves itself before the next.

Free sampleISO 13485 applicability sample
$0
Roadmap Session90 min + a one-page matrix you keep
$450
Compliance kitsApplicability first, then templates to adapt
from $397
Test Strategy PackageThe full device case file
$5,500
Case KeeperKeeps the case current as the device changes
$2,500/mo

Compare every service

Two-minute check

Do you have a case, or only a quote?

Five questions. Honest answer at the end.

1. Do you have a written device description an evaluator would recognise?

2. Could you give a written reason for every standard on your quote?

3. Who wrote your EMC pass/fail criteria?

4. Have you decided report-only vs. a certification mark?

You're in good shape. The free sample will show you how we document the calls you've already made.
You have a partial case. A Roadmap Session will fill the gaps in one sitting. See what you get →
You have a quote, not a case. That's the most common starting point. Start with a Roadmap Session →

Start with your device's case.

A 90-minute Roadmap Session and a one-page standards matrix you keep, whatever you decide next.